A Battery Energy Storage System (BESS) stores electricity when it is cheap or plentiful and releases it when it is needed. It is essentially a large, managed battery connected to the grid or to a building, with the electronics and safety systems needed to run it.
Every BESS has two headline ratings, and they mean different things. Our power guide covers the underlying difference between power and energy.
A 1 MW / 2 MWh battery:
Duration = 2 / 1 = 2 hours
C-rate = 1 / 2 = 0.5C
It can deliver its full 1 MW for two hours. A 4-hour system at the same power would need 4 MWh.
Charging with 100 kWh at 88% round-trip efficiency:
Energy out ≈ 100 × 0.88 = 88 kWh
You want to supply 15 kWh of evening and night use from stored solar. Assume 90% usable depth of discharge and 92% inverter efficiency.
Battery size = 15 / (0.90 × 0.92) ≈ 18.1 kWh
So you would look for a battery of about 18–20 kWh. See our Battery Life calculator for runtime on a specific load.
A factory peaks at 500 kW and wants to cap its peak at 400 kW for 2 hours each day.
Power needed = 500 − 400 = 100 kW
Energy delivered = 100 × 2 = 200 kWh
With 90% DoD and 90% efficiency:
Battery size = 200 / (0.90 × 0.90) ≈ 247 kWh, so roughly 250 kWh
C-rate = 100 / 250 = 0.4C (a 2.5-hour battery)
Cycle life is the number of full charge-discharge cycles before capacity drops to a set level, often 80%. LFP batteries are commonly rated in the thousands of cycles.
A battery rated for 6,000 cycles, used once a day:
Life ≈ 6,000 / 365 ≈ 16 years
Real life depends on temperature, depth of discharge and how hard the battery is used, so treat the figure as a ceiling, not a promise.
Lithium batteries can overheat if damaged or poorly managed, so BESS design includes temperature monitoring, ventilation, fire detection and suppression, and spacing between units. Installations typically follow recognised standards for energy storage systems and fire-propagation testing, such as UL 9540 and UL 9540A. Always use qualified installers and follow local electrical codes. Cables and breakers must also be sized for the high currents involved, which our Wire Gauge calculator helps with.
Try each one before you open the answer.
Duration = 4 / 2 = 2 hours. C-rate = 2 / 4 = 0.5C.
100 × 0.90 × 0.90 = 81 kWh.
4,000 / 365 ≈ 11 years.
BESS stands for Battery Energy Storage System, a setup that stores electrical energy in batteries and releases it when needed, from a home backup unit to a grid-scale installation.
MW is power, how fast the system can charge or discharge. MWh is energy, how much it can store. A 1 MW / 2 MWh system can deliver 1 MW for two hours.
It is the share of energy you get back out compared with what you put in. Lithium-ion systems typically return roughly 85–90%, so 100 kWh in gives about 85–90 kWh out.
Lithium iron phosphate (LFP) is widely used for stationary storage because of its long cycle life and good thermal stability, though other chemistries are also used.
Estimate battery runtime for your own load, or size cables for the DC side of your battery system.
Open the Battery Life Calculator